So I'm back sort of, I have had Mark 5 done but needed to find the right accessories and with out a lab to work in, I haven't been anle to really puy in any time to do much of antthing.
So without further delay I present MARK 5.
Personal Log Entry 58: Despite the funds being pulled I was able to convince Director Vine to give me enough funds to finish the final preparations for MARK 5. Test subject number 11 is ready for final data down load and has been equipped with heavy weaponry. Test subject size is perfect for the programming for MARK 5. Rumors around the Trust have it that this guy once an American Gladiator but I like to think of him as the “equalizer”. End Log Entry 58.
Personal Log Entry 59: Test subject 11 has passed all lab testing of the data down loaded, and his physical results are far more than could have hoped for. MARK 5 is ready.
End Log Entry 59.
Attachment:
Mark 5 (3).JPG [ 184.05 KiB | Viewed 571 times ]
Attachment:
Mark 5 (7).JPG [ 144.02 KiB | Viewed 571 times ]
Attachment:
Mark 5 (9).JPG [ 141.18 KiB | Viewed 571 times ]
_________________
__________________________________________________________________________________________
"The Rise of the Purple Laser"
RED LASER FOR LIFE
In the One verse, there is One world, one enemy, One hope,......ONEFORCE!